TEMELIN NUCLEAR POWER PLANT – CZECH REPUBLIC
TEMELIN NUCLEAR POWER PLANT – CZECH REPUBLIC
Between 1996 and 1998, ZINGA was applied on the outside steel structures of the reactor hall of the Temelin Nuclear Power Plant in the Czech Republic.
The Temelin nuclear plant was highly corrosive
The nuclear reactor has a special roof above that consists of a very special steel-concrete construction with a net frame. They had to be well protected and regularly inspected.
After application in 1998
A second application with ZINGA started on 1st July 2018 and was finished on 31st October 2018.
The ZINGA consumption was approx. 1.100 kg.
Cleaning:
Internal parts of the housings by WAP - hot steam and high pressure due to the presence of grease.
Outer casing: water-based degreaser and conventional WAP (not steam).
Outer part of the covers : ZINGA with approx 160 – 190 µm DFT.
Inner parts of the covers: ZINGA with approx. 80 - 100 µm DFT.